imagevb4.jpg (13019 bytes)

PROCUREMENT OF SUPPLIES / DESIGN AND CONSTRUCTION OF RAIL FERRY FACILITIES IN THE PORT OF POTI. GEORGIA
CLIENT : EUROPEAN COMMISSION
TACIS TRACECA PROGRAM
"HELLINIKI TECHNODOMIKI S.A. - ATHINA S.A."
DATES OF SERVICES PROVIDED : 1998 - 1999

A rail car handling and ship loading facility built at Poti harbour of Georgia of 10.000 m2 area comprising of a container handling facility, an administrative & control building and a Ra-Ra installation to serve the Poti – Odessa rail ferry line. Central piece to the facility is the floating, self stabilized Rail Linkspan. This 550t steel structure is a first of its kind with fully adjustable flotation, bearing two track rails that allow simultaneous loading/unloading operations of two trains from a vessel of up to 25.000 GRT’s capacity irrespectively of tidal conditions.

TRITON Consulting Engineers was responsible for the conceptual and detail engineering design, the preparation of the technical specifications, the contractual requirements and tender documentation of the project, the assessment of the tenders, the technical overview and quality control during construction.



The project involved the construction of a floating steel approach bridge for rail use, weighing 550t and a heavy port pavement for container use.



The innovative design of the first of its kind worldwide linkspan allows total freedom of movement. It can accommodate both special 24.000t Ra-Ra ships and most of the Ro-Ro ships. Design and construction was certified by Lloyds Register of shipping.

 


The project was completed in April 1999 and hence it has been operating without problems.

 

Up one Level TRITON Home Page


Copyright  ©
2007 TRITON Consulting Engineers