imagevb4.jpg (13019 bytes)

QUALITY CONTROL & GEOTECHNICAL CONSULTANT SERVICES
DURING THE CONSTRUCTION OF THE KORIS DAM IN CHIOS ISLAND

GEOTECHNICAL WORKS : 503.973,45 €

CLIENT MINISTRY OF AGRICULTURAL DEVELOPMENT

STARTING - COMPLETION DATE 07/2006 – ON GOING


The project includes the following:
• Supervision of the dam’s construction works
• Quality Control of the construction Material
• Elaboration - verification of the necessary studies for the construction of the project (dam stability design geological mapping of the foundation area, geotechnical design of access roads etc).
• Supervision, elaboration of studies and quality control of the necessary subsidiary works (water pumping, grouting etc.)

 

Up one Level TRITON Home Page


Copyright  ©
2007 TRITON Consulting Engineers