Construction of Cellular Box Caissons at Igoumenitsa Port

 

Floating platform with eqipment and rigging
connected to the shore
 

 

insideFloating platform with caisson under construction inside
 

 

basePlatform crew preparing for the concreting of the caisson base. Sliding form, (not involved in this particular phase of construction) is suspended from the roof.

 

reinforcementCompletion of the caisson's base. While waiting for the sliding metal-form to be positioned in contact with the base and start concreting the walls of the caisson, vertical reinforcement can rise up to 4 meters, whereas horizontal reinforcement can only be installed at a maximum of 1 meter from the base, exactly matching the height of the sliding form.
 
formPartially submerged caisson under construction.

 

Tug haulingCompleted caisson hauled out of the platform.

 

tugs positioningTugs maneuvering concrete caisson while afloat, to its final position.

 

storageTemporary storage of completed caissons in shallow waters.
 
 
 

 