RESTORATION OF SLOPE STABILITY AFTER A LANDSLIDE Project tasks included: • Execution of sampling drillings of 145,9m in total length, while providing Technical Consultant Services for the investigation of the sliding events along the Stavros – Lavrio Highway at the positions K9, T3 and the slope in-between. • FIELD – LABORATORY WORKS a. Execution of 9 sampling boreholes along with field tests b. Execution of laboratory tests on soil and rock samples • GEOTECHNICAL DESIGN WORKS . |
|
|