RESTORATION OF SLOPE STABILITY AFTER A LANDSLIDE
ON HIGHWAY STAYROS – LAVRΙΟ, KERATEA DETOUR SECTION
 
GEOTECHNICAL WORKS BUDGET : 90.000

CLIENT: NEOS DEFKALION

STARTING – COMPLETION DATE 2005 – 2006

Project tasks included:

• Execution of sampling drillings of 145,9m in total length, while providing Technical Consultant Services for the investigation of the sliding events along the Stavros – Lavrio Highway at the positions K9, T3 and the slope in-between.

• FIELD – LABORATORY WORKS a. Execution of 9 sampling boreholes along with field tests b. Execution of laboratory tests on soil and rock samples

• GEOTECHNICAL DESIGN WORKS
a. Results Evaluation Report
b. Final Design of the Restoration & Protection of the slopes measures

.

 