NEW TANKER TERMINAL AT KING FAHD INDUSTRIAL PORT, JUBAIL, KINGDOM OF SAUDI
ARABIA
CLIENT : HUTA-HEGERFELD SAUDIA LTD
STARTING – COMPLETION DATE: NOV. 2002 – OCT. 2004

Triton has carried out the detail design of a new oil berth, No 54, at Jubail
port and provided technical consultancy services during its construction. The
pier has sufficient capacity to handle chemical product tankers of between
20,000 and 80,000 DWT (with a max. displacement of 100.000 metric tones). The
berth consists of a concrete main deck supported on steel foundation piles. An
approach trestle which accommodates an access road and pipe racks for products
and utilities pipelines, connects the facility to the shore. The berth is
complemented by a flexible mooring and fendering system consisting of four
breasting dolphins and four mooring dolphins. Six catwalks have been constructed
connecting the mooring dolphins, breasting dolphins and the loading platform.