RAINFALL RUNOFF TO THE EXISTING DRAINAGE CHANNEL IN THE AMERICAN BASE IN
N.MAKRI The purpose of the ground investigation works was to verify the soil conditions in the projects foundation area and especially: • The verification of the stratigraphy of the area, meaning the depth and thickness of each soil layer under the soil surface. • The determination of the physical and mechanical characteristics of the soil and the complete investigation of the geotechnical conditions. For the implementation of the above the following were executed: a. Nine (9) sampling boreholes in the project area along with the necessary
in situ tests.
. |
|
|