imagevb4.jpg (13019 bytes)

RAINFALL RUNOFF TO THE EXISTING DRAINAGE CHANNEL IN THE AMERICAN BASE IN N.MAKRI
 
GEOTECHNICAL WORKS BUDGET : 17.000

CLIENT: J/V NEA PYRA T.S.A. – M. PETRAKAKIS

STARTING – COMPLETION DATE: 5/2004 – 2/2005

The purpose of the ground investigation works was to verify the soil conditions in the projects foundation area and especially:

• The verification of the stratigraphy of the area, meaning the depth and thickness of each soil layer under the soil surface.

• The determination of the physical and mechanical characteristics of the soil and the complete investigation of the geotechnical conditions.

For the implementation of the above the following were executed:

a. Nine (9) sampling boreholes in the project area along with the necessary in situ tests.
b. Laboratory tests on selected and representative samples.

 

 

.

 