imagevb4.jpg (13019 bytes)

PROJECT: NOVOROSSIYSK TIMBER AND CONTAINER TERMINAL
CLIENT: BLACK SEA TRADE AND DEVELOPMENT BANK
DATES OF SERVICES PROVIDED : 2003 - 2004

 

Technical and financial consulting services on behalf of “Black Sea Trade and Development Bank” (Lender) for the investment of N.L.E (Borrower) for the reconstruction and modernization of the existing piers and adjacent onshore facilities at the port of Novorossiysk, Russia in order to operate as a combined container and timber handling and storage terminal.

The project included reconstruction and extension of the two loading piers together with their load handling equipment. Infrastructure onshore works included pavement areas for container stacking, open and covered timber storage facilities, administration, maintenance and storage buildings, road and rail track refurbishment etc. The investment also included repair and modernization works for the signaling & control facilities of the terminal’s railway network, as well as an extensive drainage system works for flood protection.

The consulting services included a review of the feasibility study, assessment of the Business Plan and the Investment program, evaluation of assets, design review of proposed infrastructure works, examination of quality control procedures and financial review of the construction works under progress.

 

 

Up one Level TRITON Home Page


Copyright  ©
2007 TRITON Consulting Engineers