New tanker terminal at King Fahd Industrial Port,
Jubail, Kingdom of Saudi Arabia: Detail design of a new oil berth,
No 54, at Jubail port and Technical Consultants during its construction.
|
 | Design of
Heavy
Load Transport Jigs: Mechanical
Lift Dock and Transfer System for Heavy Load Transport Jigs for the
Service of Submarines at Skaramanga Shipyards, Greece
|
 | New Port of Kavala, Greece:
Design of the
extension works of the New Port of Kavala.
|
 | Enlargement & Upgrading of the Porto Karras
Marina, Greece:
Design work as well as technical assistance contract for services
provided during construction of the extension & upgrading of the Porto
Karras marina.
|
 | Shoaiba Desalination & Power Plants New
Tanker Terminal Design:
Detail design and
technical consultancy during construction of the New Tanker Terminal of
the Shoaiba Desalination Plant.
|
 | Hellenic
Ship yards of Skaramangas:
Technical consultants for the survey regarding the rehabilitation of the
damages in the harbour infrastructure and the rails of the Hellenic
Shipyards of Skaramangas. |
 |
Construction of yachting harbour in the Olympic
Stadium (SEF) marina, Athens Greece : Extention and reconfiguration of
the "S.E.F." small craft harbour as a yachting facility providing 250
berths for crafts and yachts, with lengths ranging from 25 to 90m. |
 |
Souda Bay
Coal Terminal: Designed in 1986 with a through flow capacity of 2,500,000 tons per
year , the terminal is capable of receiving bulk carriers of up to 80,000 DWT. |
 |
Hellenic Shipyards GOLIATH Gantry Crane:
Foundation design of the beams and rails of the new gantry crane GOLIATH
of a total lifting capacity of 300t. to be installed in the Dry Dock No.
5 of the Hellenic Shipyards of Skaramangas.
|
 | Port of
Giurgiulesti oil terminal: TRITON Consulting Engineers Ltd. prepared the preliminary
design of an Oil Unloading Terminal to be developed at the Girgiulesti area of the Danube
River by the joint venture/joint stock company TECHNOVAX S.A.
|
 | Pahi Bay Crude
Unloading Terminal: The largest crude unloading terminal in the Eastern Mediterranean
consisting of a steel structure on monopiles capable of handling tankers in excess of
500,000 DWT.
|
 | Mooring system
for cable ship at Stilida: Design and supervision of the construction of a mooring
system comprising 4 steel buoys for the mooring of the cable ship "Thalis" of
the Hellenic Telecommunications Organisation, at Agia Marina Stylida (Maliakos Gulf).
|
 | Santorini
Island Multi Buoy Mooring System: The multi buoy system is anchored at depths of water
exceeding 200 metres and is capable of holding four cruise liners of 10,000 GRT capacity
simultaneously even in adverse weather conditions.
|
 | LinkSpan
for Poti port, Georgia
: Design and construction of a RA-RA and RO-RO
Linkspan for Poti port in Georgia.
|
 | Ship scrap
yard at Keramoti Bay: A ship scrap yard enabling simultaneous cutting of two 50,000
DWT Ships. The project consists of an offshore artificial island connected to the shore by
an access way.
|
 | Liquefied
Natural Gas (LNG) Terminal at Revithoussa island: Design and subsequent preparation of
bid documents for a liquefied natural gas (LNG) terminal.
|
 | Saloniki Bay
Multi Buoy Mooring System and Underwater Pipeline: The multi buoy system is anchored
at 18 metre water depth and is capable of servicing tankers up to 230,000 DWT semi-loaded.
It is combined with a 40 inch diameter underwater steel pipeline.
|
 | Offshore oil
unloading facility in Crete: Design of an offshore oil terminal in the island of Crete
on behalf of the Public Power Corporation of Greece.
|
 | Shoaiba
(Shu'aybah) Steam Power Plant, Saudi Arabia: Design of marine structures and related
buildings in a major electrical power plant in Saudi Arabia.
|
 | New Port of
Igoumenitsa; Geotechnical
Investigation, Master planning, final design and preparation of tender documents (in
association with A.D.K. Engineers) for the construction of a new Ferry boats Terminal
together with building complexes, road network and related infrastructure
|
 | Mykonos New
Port and Marina: The new port in Mykonos, designed in a form of an offshore island,
will be capable of accommodating five ferryboats and two cruisers simultaneously and will
solve the existing severe congestion problem at the old harbour of this very popular
tourist island. The proposed harbour works are combined with a 200 small craft marina,
ship repair and storage facilities.
|
 | Advanced
submarine Naval Base: The design includes a 270 m wharf for submarines and fast patrol
vessels.
|
 | Alumina Plant
at Viotia: Bulk and liquid handling terminals for the alumina production plant. Design
of two terminals to handle bauxite ore, Alumina grain, fuels and caustic soda for the new
600,000 tonne per year capacity plant.
|
 | New Port of
Patras; Geotechnical
Investigation, Master planning, final design and preparation of tender documents (in
association with A.D.K. Engineers) for the construction of a new Ro-Ro and passenger
ferryboat terminal.
|
 | Nea Aghialos
Underwater Oil Pipelines and Mooring System: Design of a conventional open sea mooring
system for 27,000 DWT ships together with an underwater oil unloading facility.
|
 | Extension of Pier
No. 6 of the commercial port of Thessaloniki: Design of a 600m quaywall extension of
pier No 6 of the commercial port of Thessaloniki.
|
 | Olympic Marine
in Lavrio: Design of floating concrete pontoons in luxurious marina in Lavrio.
|
 | A number of floating and underwater
pipelines for effluent out fall, water transport and oil unloading operations.
|