Main MenuMaritime Coastal EngineeringMarina DesignSelected ProjectsRhodes Marina
Project:Rhodes Marina
Client:Rodos Marina S.A.
Location:Rhodes, Greece
Date:2007-2011
The project comprises completion of the unfinished harbour works, construction of marina administrative and support buildings, a commercial Mall and real estate development including recreational and spa facilities.

The harbour works include:
• Completion of the main breakwater with a total length of 500 meters constructed with 6 and 9t accropodes as well as of the lee breakwater
• Completion of 1300m. Long quaywalls,
• 520m long floating piers
• repair yard with launching ramps and travelift of 500t lifting capacity,
• water, electricity, data, TV and
• gas station
The marina will be able to accommodate up to 385 boats of mean length 20m. with maximum sizes up to 35-40m in a modern marina protected under any weather circumstances and will service .
• boats of the Rhodes inhabitants
• boats of Greek clients staying temporarily in the wider area
• boats of foreign clients

The building programme includes:
• Administrative building of 270 sq. m. area
• Restaurant and café of 670 sq. m. area
• Supermarket of 1200 sq. m. area
• 3 W.C.-storage buildings of 100 sq. m. area each
• Boat maintenance and dry storage building including paint shop, laundry of 500 sq. m. area.
• Two substation and pumphouse buildings of 160 sq. m. area
• Boat repair hangar of 700 sq. m. area
• Guard house of 50 sq. m. area
• A commercial Mall of 15.000 sq. m. area
The building development complements the marina facilities creating a centre of attraction for Rhodes citizens especially during the winter months. The same applies fir the foreign tourists during the summer months (45-70% of whom will visit the mall). The Mall comprises food and electric appliances supermarkets, bookstores, sports, Restaurants, Men and Women clothes, Services, Cinemas, bowling etc.

TRITON Consulting Engineers has elaborated all the preliminary and final studies of the harbour, geotechnical, architectural, structural, electromechanical, hydraulic and road works (with a total fee of 500.000€) and has already signed a contract for the elaboration of the detailed design as well as services as an independent Technical Consultant for the supervision of the works.

Previous Project:

Old Mykonos Port