MOORING SYSTEM FOR A CABLE SHIP AT STILIDA
CONSTRUCTION COST : US$ 5 million
CLIENT : ALCATEL CABLES GREECE S.A.
Design
and supervision of the construction of a mooring system comprising 4 steel buoys 2.50 m in
diameter by 1.35 m long for mooring of the cable ship "Thalis" of the Hellenic
Telecommunications Organisation, at Agia Marina Stylida (Maliakos Gulf).
The buoys are anchored to the sea bottom via 50mm diameter chains and 4,000 kilogram
anchors. The fibre optic passing through a submarine polyethylene pipeline is loaded from
a floating platform onto the cable ship "Thalis".
|